The first two of three vessels will be used to support U.S. Naval submarine maintenance and repair operations.
After a number of changes were made to the original hull design, we assisted in redrawing the lines to accommodate those changes and ensure a very fair hull, which was then relofted at Armstrong Marine, in Port Angeles, Washington.